The new project page contains a feature that allows a user to copy all project details, the script and/or data from an existing project. Always make sure the correct client is selected before selecting create new PO.
Copy Script
Copying the script will create a verbatim copy of the script in the new project including responses. Script substitutions will need to be reentered after copying over a script. It is best practice to check the script after copying in case any errors do occur with formatting.
Copy Data
The data of an existing project can be copied into a new project with two options for what will be carried over. The First option is ALL, this will pull all information from the data. The second option is selected, this allows the user to limit records to either code (Complete, do not call, etc.) or questions and replies.