Skip to content
English
  • There are no suggestions because the search field is empty.

Agent Metrics

The specific metrics and targets used can vary depending on the type of project.

Typical metrics for agents include:

CPH (Completes Per Hour):

  • Patch Projects: 3-5 completes per hour
  • Voter ID/GOTV: 30-40 completes per hour
  • Surveys: 0.5 - 2 per hour

AHT (Average Handle Time):

  • Patch Projects: 3-5 minutes
  • Voter ID/GOTV: 1-3 minutes
  • Surveys: 30-60 minutes

Pending Disposition (After Call Work):

  • All Projects: Less than 30 seconds

Break Time:

  • 10 minutes every 2-4 hours (paid)
  • Breaks outside the 10-minute window should be taken off the clock